Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
3574 results ✕ Clear filters

APPROXIMATE QUEUEING NETWORK MODELS FOR CLOSED FABRICATION/ASSEMBLY SYSTEMS. PART I: SINGLE LEVEL SYSTEMS

Production and Operations Management 1994
We address the issue of performance analysis of fabrication/assembly (F/A) systems, which are systems that first fabricate components and then join the components and subassemblies into a product. Here we consider an F/A system consisting of a single assembly station with input from K fabrication stations. We assume that the system uses a Kanban control mechanism with a fixed number of kanbans circulating between each input station and the assembly station. Even with Markovian assumptions, computing an exact solution for the performance evaluation of such systems becomes intractable due to an explosion in the state‐space. We develop computationally efficient algorithms to approximate the throughput and mean queue lengths. The accuracy of the approximations is studied by comparison to exact results ( K = 2) and to simulations ( K > 2). Part II of this paper demonstrates how these models can be used as building blocks to evaluate more complex F/A systems with multiple levels of assembly stations.

STRATEGIC PRODUCTION COMPETENCE: CONVERGENT, DISCRIMINANT, AND PREDICTIVE VALIDITY

Production and Operations Management 1994
A resource‐based construct of manufacturing competence, termed strategic production competence, is examined with respect to its convergent, discriminant, and predictive validity. The construct evaluates manufacturing performance across a comprehensive domain of competitive priorities relative to item importance and performance. Data from an earlier study of furniture firms ( n = 65) are used for statistical testing. The results establish the convergent and discriminant validity of strategic production competence and show that it is positively related to business performance.

SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS

Production and Operations Management 1994
We examine the phenomenon of shifting production bottlenecks from an analytic perspective. We quantify the propensity of a work center to be a bottleneck, defined as maximal queue length, using a simple Jackson production network model. Comparison of the analytic model against an empirical simulation‐based model shows that the two are in good agreement. A scalar measure of bottleneck shiftiness is proposed and used to investigate several policies for mitigating shiftiness. Simulation experiments show that several commonly observed managerial policies for coping with shifting bottlenecks actually increase shiftiness, but that shiftiness declines when the capacity of nonbottleneck resources is increased.

A BRANCH AND BOUND PROCEDURE FOR SETUP PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS

Production and Operations Management 1993
We address a medium‐ to short‐term production planning problem in a flexible manufacturing environment. First we present a single‐machine, mixed integer programming model for part type selection and lot‐sizing problems over a T‐period planning horizon. Demand for part types changes dynamically through the periods. The objective is to meet the demand for part types during the periods they are demanded. Available machine time and tool magazine capacities are the system constraints in our models. We next extend on the single‐ machine model to include multiple machines. In addition to part type selection and lotsizing decisions, the extended model also addresses the machine‐loading decision. We present exact branch and bound procedures based on linear programming relaxations for the two models. We also report the results of our computational experiments.

THE VALIDITY OF THE INDEPENDENT INCREMENTS ASSUMPTION FOR PRODUCTION: AN EMPIRICAL STUDY OF AN AUTOMOTIVE ASSEMBLY PLANT

Production and Operations Management 1993
In assembly plants, random line stoppages cause production variability. For analytic tractability and data availability, researchers commonly assume that the production process possesses the independent increments property (necessary for a process to be Poisson). If the production process has independent increments, then the production in any interval is independent of the production in any other nonoverlapping interval. This property means, for one thing, that the current period's production is never influenced by previous production periods. Intuition, however, suggests that current production could be correlated to past production‐violating this assumption of independence. If production problems persist from one period to the next, then one would expect the production in adjacent time periods to be correlated. Although the independent increments property is oflen assumed, its validity has not been demonstrated in practice. We analyze data from an automotive assembly plant to assess the validity of the independent increments assumption for its production.

TRACKING PRODUCT‐PROCESS INTERACTIONS: A RESEARCH PARADIGM*

Production and Operations Management 1993
To design (or redesign) a competitive product, it is imperative that both the sales and manufacturing cost implications are assessed in a structured way. That is, the interactive (multidimensional) aspects of manufacturing and marketing variables need to be positioned in a proper perspective so that the system impact of variation in one or more variables may be ascertained quickly. In this paper we show how some of the system‐related paradigms can be used as foundations for developing quantitative and qualitative models for tracking such interactive ímpacts. The emphasis is not on building complex mathematical models to solve specific problems but on providing a framework where system properties expressed as simple postulates can be used in an intelligent way to assess the impact of improvements in specific product‐process scenarios.

A COMPARISON OF ORDER‐RELEASE AND DISPATCH RULES FOR THE DYNAMIC WEIGHTED EARLY/TARDY PROBLEM

Production and Operations Management 1993
The early/tardy problem is one of the most vexing pieces of the complex production scheduling decision process. So far most of the research has been on single‐machine environments. Hence, we considered the weighted early/tardy scheduling problem in a simulated dynamic multimachine job shop. We analyzed controlled job‐release and dispatch rules using time and cost information at a variety of stationary and nonstationary utilization rates, due‐date allowances, and early/tardy cost levels. We found a newly developed method for controlling the release for all job operations using early/tardy cost information, superior to other release mechanisms overall in both our stationary and nonstationary analyses. We found immediate release useful at many high utilization conditions and a gateway‐only release method best in many low utilization conditions. A modified version of a single‐machine early/tardy dispatch method was clearly superior to the dispatch rules for almost all the simulated shop conditions.