Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
154 results ✕ Clear filters

Staffing Call Centers with Uncertain Arrival Rates and Co‐sourcing

Production and Operations Management 2014 open access
In a call center, staffing decisions must be made before the call arrival rate is known with certainty. Once the arrival rate becomes known, the call center may be over‐staffed, in which case staff are being paid to be idle, or under‐staffed, in which case many callers hang‐up in the face of long wait times. Firms that have chosen to keep their call center operations in‐house can mitigate this problem by co‐sourcing; that is, by sometimes outsourcing calls. Then, the required staffing N depends on how the firm chooses which calls to outsource in real time, after the arrival rate realizes and the call center operates as a M / M / N + M queue with an outsourcing option. Our objective is to find a joint policy for staffing and call outsourcing that minimizes the long‐run average cost of this two‐stage stochastic program when there is a linear staffing cost per unit time and linear costs associated with abandonments and outsourcing. We propose a policy that uses a square‐root safety staffing rule, and outsources calls in accordance with a threshold rule that characterizes when the system is “too crowded.” Analytically, we establish that our proposed policy is asymptotically optimal, as the mean arrival rate becomes large, when the level of uncertainty in the arrival rate is of the same order as the inherent system fluctuations in the number of waiting customers for a known arrival rate. Through an extensive numerical study, we establish that our policy is extremely robust. In particular, our policy performs remarkably well over a wide range of parameters, and far beyond where it is proved to be asymptotically optimal.

The Maximum Throughput on a Golf Course

Production and Operations Management 2014
We develop stochastic models to help manage the pace of play on a conventional 18‐hole golf course. These models are for group play on each of the standard hole types: par‐3, par‐4, and par‐5. These models include the realistic feature that k −2 groups can be playing at the same time on a par‐ k hole, but with precedence constraints. We also consider par‐3 holes with a “wave‐up” rule, which allows two groups to be playing simultaneously. We mathematically determine the maximum possible throughput on each hole under natural conditions. To do so, we analyze the associated fully loaded holes, in which new groups are always available to start when the opportunity arises. We characterize the stationary interval between the times successive groups clear the green on a fully loaded hole, showing how it depends on the stage playing times. The structure of that stationary interval evidently can be exploited to help manage the pace of play. The mean of that stationary interval is the reciprocal of the capacity. The bottleneck holes are the holes with the least capacity. The bottleneck capacity is then the capacity of the golf course as a whole.

The 1st POMS Applied Research Challenge 2014 Awards

Production and Operations Management 2014
Production and Operations ManagementVolume 24, Issue 3 p. 359-359 Original Article The 1st POMS Applied Research Challenge 2014 Awards Felipe Caro, Felipe Caro [email protected] UCLA Anderson School of Management, UCLA, 110 Westwood Plaza, Los Angeles, California, 90095 USASearch for more papers by this authorChristopher S. Tang, Christopher S. Tang [email protected] UCLA Anderson School of Management, UCLA, 110 Westwood Plaza, Los Angeles, California, 90095 USASearch for more papers by this author Felipe Caro, Felipe Caro [email protected] UCLA Anderson School of Management, UCLA, 110 Westwood Plaza, Los Angeles, California, 90095 USASearch for more papers by this authorChristopher S. Tang, Christopher S. Tang [email protected] UCLA Anderson School of Management, UCLA, 110 Westwood Plaza, Los Angeles, California, 90095 USASearch for more papers by this author First published: 24 September 2014 https://doi.org/10.1111/poms.12258_1Citations: 3Read the full textAboutPDF ToolsRequest permissionExport citationAdd to favoritesTrack citation ShareShare Give accessShare full text accessShare full-text accessPlease review our Terms and Conditions of Use and check box below to share full-text version of article.I have read and accept the Wiley Online Library Terms and Conditions of UseShareable LinkUse the link below to share a full-text version of this article with your friends and colleagues. Learn more.Copy URL Share a linkShare onFacebookTwitterLinkedInRedditWechat No abstract is available for this article.Citing Literature Volume24, Issue3March 2015Pages 359-359 RelatedInformation

Balancing Revenues and Repair Costs under Partial Information about Product Reliability

Production and Operations Management 2014
We consider the problem faced by a company selling a product with warranty and under partial information about the product reliability. The product can fail from multiple failure types, each of which is associated with an inherently different repair cost. If the product fails within the warranty duration, then the company is required to pay the repair cost. The company does not know the probabilities associated with different failure types, but it learns the failure probabilities as sales occur and failure information is accumulated. If the failure probabilities turn out to be too high and it becomes costly to fulfill the warranty coverage, then the company may decide to stop selling the product, possibly replacing it with a more reliable alternative. The objective is to decide if and when to stop. By formulating the problem as a dynamic program with Bayesian learning, we establish structural properties of the optimal policy. Since computing the optimal policy is intractable due to the high dimensional state space, we propose two approximation methods. The first method is based on decomposing the problem by failure types and it provides upper bounds on the value functions. The second method provides lower bounds on the value functions and it is based on a deterministic approximation. Computational experiments indicate that the policy from the first method provides noticeable benefits, especially when it is difficult to form good estimates of the failure probabilities quickly.

Of Physics and Factory Physics

Production and Operations Management 2014
The “Principle of Least Action" is the foundational principle of fundamental physics. Application of this principle to the supply chain naturally results in an “uncertainty principle” linking variation in production to variation in net‐inventory. The model also provides an easy means of determining the stationary distribution of net‐inventory for a variety of control strategies. The formalism results in a control strategy that outperforms commonly used control methods.

Balancing Production and Distribution in Paper Manufacturing

Production and Operations Management 2014
A paper manufacturing plant minimizes its production cost by using long production runs that combine the demands from its various customers. As jobs are completed, they are released to distribution for delivery. Deliveries are made by railcars, each of which is dedicated to one customer. Long production runs imply that maximizing railcar utilization requires holding the cars over several days or holding completed jobs within the loading facility. Each of these methods imposes a cost onto the distribution function. We find how distribution can minimize its cost, given production's schedule. We then consider the problem of minimizing the company's overall cost of both production and distribution. A computational study using general data illustrates that the distribution cost is reduced by 25.80% through our proposed scheme, and that the overall cost is reduced an additional 4.40% through our coordination mechanism. An optimal algorithm is derived for a specific plant's operations.