← Search

Journal of Accounting and Economics Vol. 19 No. 2-3 1995

On the interrelation between production technology, job design, and incentives

Thomas Hemmer

University of Washington

Abstract

For a two-stage production process, two assignments of tasks among two agents are studied: an ‘assembly line’, where each agent is responsible for one stage, vs. a ‘team’, where agents are jointly responsible for all tasks. When attention paid to quality at the initial stage affects the final-stage task, the team approach is optimal for unsophisticated production technology. As technology improves, the assembly line becomes dominating while continued improvements eventually makes it optimal to abandon the assembly line again in favor of the team approach. When such switches in job design occur, the optimal investment in technology exhibits positive jumps.

DOI
10.1016/0165-4101(94)00383-g
Volume
19
Issue
2-3
Pages
209-245
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite