← Search

Management Science Vol. 6 No. 1 1959

Scheduling with Deadlines and Loss Functions

Robert McNaughton

The Moore School of Electrical Engineering, University of Pennsylvania

Abstract

The problem of this paper is that of scheduling several one-stage tasks on several processors, which are capable of handling the tasks with varying degrees of efficiency, to minimize the total loss, which is a sum of losses associated with the individual tasks. Each task has a deadline; the individual loss associated with it is a function of amount of time between the deadline and the time of completion if the former precedes the latter, and zero otherwise.

DOI
10.1287/mnsc.6.1.1
Volume
6
Issue
1
Pages
1-12
Language
en
Sources
bibtex:phds-export.bib crossref openalex

Cite