← Search

Management Science Vol. 43 No. 1 1997

Remarks on: “Some Extensions of the Discrete Lotsizing and Scheduling Problem”

Wolfgang Bruggemann1; Hermann Jahnke2

1 Institut fur Logistik und Transport, Universitat Hamburg, 20146 Hamburg, Germany · 2 Wirtschaftswissenschaftliche Fakultat, Universitat Bielefeld, 33615 Bielefeld, Germany

Abstract

Saloman et al. (Salomon, M., L. G. Kroon, R. Kuik, L. N. Van Wassenhove. 1991. Some extensions of the discrete lotsizing and scheduling problem. Management Sci. 37 801–812.) claim the NP-completeness of different variants of the discrete lot-sizing and scheduling problem (DLSP) which are differentiated by using a six-field notation. However, some of the given proofs are incorrect because the transformations employed map certain data values of the preimage problem to the number of data in the resulting instance and are hence not polynomial. As an example, we concentrate here on the 1/*/SI/G/A-optimization problem (Salomon et al. [Salomon, M., L. G. Kroon, R. Kuik, L. N. Van Wassenhove. 1991. Some extensions of the discrete lotsizing and scheduling problem. Management Sci. 37 801–812.], Theorem 3). Similar arguments pertain to the 1/*/A/G/SI-DLSP, too.

DOI
10.1287/mnsc.43.1.122
Volume
43
Issue
1
Pages
122-122
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite