Management Science Vol. 37 No. 9 1991
Paradox or At Least Variance Found: A Comment on “Mean-Variance Approaches to Risk-Return Relationships in Strategy: Paradox Lost”
open access
Abstract
In general, the problem is that the computed mean-variance relationship for a period of time cannot be identified in distinction to the effects of shifts in the relationship over time—without additional information or assumptions. Thus, using a mean-variance approach to risk-return relationships means that statements about the nature of the mean-variance association cannot be confirmed in a nontrivial fashion within the empirical system nor generalized to any other time period—including subperiods. (Ruefli 1990) (emphasis in original)
- DOI
- 10.1287/mnsc.37.9.1206
- Volume
- 37
- Issue
- 9
- Pages
- 1206-1210
- Language
- en
- Sources
- bibtex:phds-export.bib crossref openalex