Management Science Vol. 45 No. 6 1999
Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
Abstract
This paper focuses on simultaneous resource allocation, lot-sizing, and scheduling in a multimachine, deterministic ELSP environment. We consider the problem of apportioning item production to distinct manufacturing lines with different costs and capabilities (production rates). The objective is to minimize the long-run average production, setup, inventory, and shortage penalty costs (due to lost sales). Restricting attention to rotation schedules, we develop a concave minimization model of the problem, generate heuristic solutions and a lower bound on the cost of any feasible solution. Computational experiments indicate that our heuristic solution is within a few percent of the lower bound. We also investigate sensitivity of costs to model parameters, and illustrate how our model may be used to determine target values for equipment utilization.
- DOI
- 10.1287/mnsc.45.6.889
- Volume
- 45
- Issue
- 6
- Pages
- 889-904
- Language
- en
- Sources
- bibtex:phds-export.bib openalex crossref