← Search

Management Science Vol. 45 No. 6 1999

Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines

Ramesh Bollapragada1; Uday Rao2

1 Bell Laboratories, Lucent Technologies, Room 2L-515, 101 Crawfords Corner Road, Holmdel, New Jersey 07733 · 2 Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213

Abstract

This paper focuses on simultaneous resource allocation, lot-sizing, and scheduling in a multimachine, deterministic ELSP environment. We consider the problem of apportioning item production to distinct manufacturing lines with different costs and capabilities (production rates). The objective is to minimize the long-run average production, setup, inventory, and shortage penalty costs (due to lost sales). Restricting attention to rotation schedules, we develop a concave minimization model of the problem, generate heuristic solutions and a lower bound on the cost of any feasible solution. Computational experiments indicate that our heuristic solution is within a few percent of the lower bound. We also investigate sensitivity of costs to model parameters, and illustrate how our model may be used to determine target values for equipment utilization.

DOI
10.1287/mnsc.45.6.889
Volume
45
Issue
6
Pages
889-904
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite