Management Science Vol. 21 No. 5 1975
Minimizing the Time-in-System Variance for a Finite Jobset
Abstract
There are a finite number of jobs to be scheduled on a single machine. All jobs are available from the start and the objective is to sequence the jobs so that the time-in-system (or equivalently, the completion time) variance is minimized. A number of necessary conditions for an optimal sequencing (which for small jobsets turn out to be sufficient) are presented.
- DOI
- 10.1287/mnsc.21.5.540
- Volume
- 21
- Issue
- 5
- Pages
- 540-543
- Language
- en
- Sources
- bibtex:phds-export.bib crossref openalex