← Search

Management Science Vol. 32 No. 4 1986

Safety Stocks in MRP—Systems with Emergency Setups for Components

Robert Carlson1; Candace A. Yano2

1 Department of Industrial Engineering and Engineering Management, Stanford University, Stanford, California 94305 · 2 Department of Industrial and Operations Engineering, University of Michigan, Ann Arbor, Michigan 48109;

Abstract

Material Requirements Planning or Manufacturing Resource Planning (MRP) systems originally were designed for a deterministic environment. Often, however, demand for finished products is uncertain and some type of buffering mechanism is necessary to provide desired levels of service. When the schedule is replanned each period, as typically is done, variability of demand may manifest itself in the form of early or “emergency” production runs. Safety stock may serve to avert some or most of these emergency production runs. We have developed a heuristic algorithm which is shown to provide extremely good guidelines for setting safety stock levels.

DOI
10.1287/mnsc.32.4.403
Volume
32
Issue
4
Pages
403-412
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite