Optimal Leadtimes Planning in a Serial Production System

Linguo Gong1; Ton de Kok2; Jie Ding3

1 Department of Quantitative Business Analysis, Louisiana State University, Baton Rouge, Louisiana 70803 · 2 Department of Mathematics and Computing Science, University of Technology, Eindhoven, Netherlands · 3 Department of Management Sciences, Rider University, Lawrenceville, New Jersey 08648

Abstract

Consider an N stage serial production line where the processing times of orders may be random. Since the carrying costs increase from stage to stage, the standard production procedure, that is, to determine a total leadtime for the entire order by taking an appropriate percentile of the distribution of total processing time and then release the order immediately from stage to stage during the process, may not be optimal since it ignores inventory carrying costs. This article studies a per stage planned leadtime dispatching policy for such systems. The order will not be released immediately to the next workstation prior to a predetermined delivery time, or planned leadtime. The vector of planned leadtimes at workstations is to be determined by trading off expected holding costs at all stages and expected penalty costs for exceeding the total planned leadtime. We show that the optimal vector of planned leadtimes may be obtained efficiently by solving an equivalent serial inventory model of the type considered in Clark and Scarf (1960).

DOI
10.1287/mnsc.40.5.629
Volume
40
Issue
5
Pages
629-632
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite