Management Science Vol. 39 No. 3 1993
Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
Abstract
One of the necessary and sufficient conditions derived by F. F. Boctor (1982) for feasibility of a repetitive two-product schedule is that the cycle times (T 1 and T 2 ) must be integer multiples of some time interval T (Propositions 2, 3 and 4). This result also holds for N-product schedules. However, the proof for Propositions 3 and 4 in [1] is not exactly valid and therefore a correction has to be made.
- DOI
- 10.1287/mnsc.39.3.387
- Volume
- 39
- Issue
- 3
- Pages
- 387-388
- Language
- en
- Sources
- bibtex:phds-export.bib openalex crossref