← Search

Management Science Vol. 39 No. 3 1993

Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem

Chen Shaoxiang

Departement voor Toegepaste, Economische Wetenshappen, Katholieke Universiteit Leuven, Dekenstraat 2, 3000 Leuven, Belgium

Abstract

One of the necessary and sufficient conditions derived by F. F. Boctor (1982) for feasibility of a repetitive two-product schedule is that the cycle times (T 1 and T 2 ) must be integer multiples of some time interval T (Propositions 2, 3 and 4). This result also holds for N-product schedules. However, the proof for Propositions 3 and 4 in [1] is not exactly valid and therefore a correction has to be made.

DOI
10.1287/mnsc.39.3.387
Volume
39
Issue
3
Pages
387-388
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite