← Search

Management Science Vol. 32 No. 10 1986

A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions

Robert A. Russell

College of Business Administration, The University of Tulsa, Tulsa, Oklahoma 74104

Abstract

The problem addressed in this paper is the scheduling of activities in a project to maximize net present value given cash inflows, outflows, and resource restrictions. Although optimization procedures exist for small problems of this type, they generally cannot solve large-scale problems and may not be widely available. Six heuristic scheduling rules are compared on 80 test problems. The test problems include large-scale engineering construction projects as well as 50 resource constrained problems from the literature.

DOI
10.1287/mnsc.32.10.1291
Volume
32
Issue
10
Pages
1291-1300
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite