Management Science Vol. 32 No. 10 1986
A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions
Abstract
The problem addressed in this paper is the scheduling of activities in a project to maximize net present value given cash inflows, outflows, and resource restrictions. Although optimization procedures exist for small problems of this type, they generally cannot solve large-scale problems and may not be widely available. Six heuristic scheduling rules are compared on 80 test problems. The test problems include large-scale engineering construction projects as well as 50 resource constrained problems from the literature.
- DOI
- 10.1287/mnsc.32.10.1291
- Volume
- 32
- Issue
- 10
- Pages
- 1291-1300
- Language
- en
- Sources
- bibtex:phds-export.bib openalex crossref