← Search

Management Science Vol. 39 No. 6 1993

Level Schedules for Mixed-Model, Just-in-Time Processes

George Steiner; Scott Yeomans

Management Science and Information Systems Area, Faculty of Business, McMaster University, Hamilton, Ontario, Canada L8S 4K1

Abstract

A mixed-model manufacturing facility running under a Just-in-Time (JIT) production system is controlled by setting the production sequence of the final assembly process. This sequence is set to achieve the primary goal of an organization operating under a JIT system, which is to maintain a constant rate of part usage. In this paper, a graph-theoretic approach is used to determine an optimal solution for this goal for a new, nonconvex objective function. Furthermore, it is shown that a schedule always exists such that, at all times, the deviation of actual production from the desired level of production for every product is never more than one unit.

DOI
10.1287/mnsc.39.6.728
Volume
39
Issue
6
Pages
728-735
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite