Management Science Vol. 39 No. 6 1993
Level Schedules for Mixed-Model, Just-in-Time Processes
Abstract
A mixed-model manufacturing facility running under a Just-in-Time (JIT) production system is controlled by setting the production sequence of the final assembly process. This sequence is set to achieve the primary goal of an organization operating under a JIT system, which is to maintain a constant rate of part usage. In this paper, a graph-theoretic approach is used to determine an optimal solution for this goal for a new, nonconvex objective function. Furthermore, it is shown that a schedule always exists such that, at all times, the deviation of actual production from the desired level of production for every product is never more than one unit.
- DOI
- 10.1287/mnsc.39.6.728
- Volume
- 39
- Issue
- 6
- Pages
- 728-735
- Language
- en
- Sources
- bibtex:phds-export.bib openalex crossref