← Search

Management Science Vol. 39 No. 5 1993

Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem

Chung-Yee Lee1; T. C. E. Cheng2; Bertrand M.T. Lin3

1 Department of Industrial and Systems Engineering, University of Florida, Gainesville, Florida 32611 · 2 Department of Management, Hong Kong Polytechnic, Hung Hom, Kowloon, Hong Kong · 3 Department of Computer and Information Science, National Chaio-Tung University, Hsinchu, Taiwan 30050, R.O.C.

Abstract

This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analyzed.

DOI
10.1287/mnsc.39.5.616
Volume
39
Issue
5
Pages
616-625
Language
en
Sources
bibtex:phds-export.bib openalex crossref

Cite