Management Science Vol. 39 No. 5 1993
Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
Abstract
This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analyzed.
- DOI
- 10.1287/mnsc.39.5.616
- Volume
- 39
- Issue
- 5
- Pages
- 616-625
- Language
- en
- Sources
- bibtex:phds-export.bib openalex crossref