Management Science Vol. 34 No. 7 1988
Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs
Abstract
This paper considers the problem of scheduling n jobs, each having a processing time, a due date and a weight, on a single machine to minimize the weighted number of late jobs. An O(n log n) algorithm is given for solving the linear programming problem obtained by relaxing the integrality constraints in a zero-one programming formulation of the problem. This linear programming lower bound is used in a reduction algorithm that eliminates jobs from the problem. Also, a branch and bound algorithm that uses the linear programming lower bound is proposed. Computational results with branch and bound algorithms that use this and other lower bounds and with a dynamic programming algorithm for problems with up to 1000 jobs are given.
- DOI
- 10.1287/mnsc.34.7.843
- Volume
- 34
- Issue
- 7
- Pages
- 843-858
- Language
- en
- Sources
- bibtex:phds-export.bib openalex crossref