← Search

Quarterly Journal of Economics Vol. 92 No. 3 1978

Capacity Constrained Peak Load Pricing

Robert E. Dansby

Nokia (United States)

Abstract

I. Introduction 387.—II. The capacity constrained peak load problem, 388.—III. Optimal multi-equipment capacity, 391.—IV. Optimal peak load prices, 393.—V. Special cases of the peak load prices 394.—VI. Conclusions, 397.

DOI
10.2307/1883150
Volume
92
Issue
3
Pages
387
Sources
openalex crossref

Cite