Production and Operations Management Vol. 18 No. 4 2009
Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
open access
Abstract
We investigate resource‐constrained project scheduling with stochastic activity durations. Various objective functions related to timely project completion are examined, as well as the correlation between these objectives. We develop a GRASP‐heuristic to produce high‐quality solutions, using so‐called descriptive sampling. The algorithm outperforms existing algorithms for expected‐makespan minimization. The distribution of the possible makespan realizations for a given scheduling policy is also studied.