Abstract

The operations management field has long recognized that a key operations objective is to match supply with demand: Either an operation must be able to respond to demand variability, or demand must be stable. There was a strong sense in the late 1980s and early 1990s that responsiveness was an important element of competitiveness, leading to the exploration of time-based strategies (Stalk 1988; Schmenner 1988; Stalk and Hout 1990; Blackburn 1991). Tapping into this energy, I and colleagues enthusiastically embarked on ambitious projects to help interested companies increase their responsiveness by reducing their lead times so that they could profit from high-mix, low-volume, and customized products—only to realize that detailed principles for lead-time reduction had not been developed for this context. Although there was general agreement that reducing lead times was important, managers attempting to act on these insights struggled to prioritize reducing lead time if it also appeared to reduce utilization, efficiency, or increase costs in other ways. In 1993 I founded the Center for Quick Response Manufacturing (QRM) at the University of Wisconsin-Madison as a university-industry partnership to address this challenge and help companies to gain competitiveness and profit from investing in lead-time reduction even when it appears to increase operating cost. Our objective over these decades has been to develop, implement, and test principles to provide guidance for such companies. The resulting tools and protocols—compiled into the QRM manufacturing strategy—have been widely applied over the ensuing three decades at hundreds of companies. The QRM Center has engaged in an average of 15 projects per year with its over 300 member companies, so over 400 company projects. It has organized around 10 workshops each year that have been attended by hundreds of managers, as well as regular international conferences every 1–2 years at which case studies of QRM implementation and their results have been presented. As a further development, in 2017 the QRM Institute, headquartered in Belgium, was established by an international network of organizations to provide access to QRM education, research, and diffusion of results in Europe. I serve as an advisor to the Board of the Institute. The initial QRM principles were summarized in a book entitled Quick Response Manufacturing that was published in 1998. The previous co-EICs of JOM requested that I write a Forum piece for the Journal of Operations Management (JOM) to reflect on the experience and learnings from the QRM Center and QRM Institute from a JOM perspective. Exploring QRM from the viewpoint of JOM led me to the article by Schmenner and Swink (1998) that summarized their Theory of Swift, Even Flow (TSEF). Whereas QRM was developed to respond to the needs of companies, deploying the mathematical principles of lead time with a focus on hands-on implementation in a large number of companies, Schmenner and Swink (1998) took a philosophy of science approach to propose a theory to explain what makes an operation productive. Although the path to QRM is quite different from that which led to the TSEF, the key elements are remarkably similar. The exercise of examining the QRM experience through a JOM lens provides some strong evidentiary support for the TSEF, demonstrating the usefulness of building bridges between perspectives. …the Swift, Even Flow theory argues for the abandonment of numerous performance measures. Measures such as machine utilization or labor efficiency…are not measures of either flow or variability. For this reason, the theory argues that they should be abandoned as measures in favor of throughput time and variability (say, delivery performance to plan). Indeed, there is some confirmation that machine utilization and labor efficiency are not associated very much with productivity (Schmenner 1991; Schmenner and Vollmann 1994). For materials to flow more evenly, one must narrow the variability associated with either the demand on the process or with the process's operations steps. Variability is measured by the variance or standard deviation of the timing or quantities demanded or of the time spent in various process steps. Variability is narrowed when the demands placed on the process are even and regular. ‘Level’ production plans are more compatible with productivity than are production plans with irregular quantities or due dates. Yin et al. (2017) used the TSEF to explore the effectiveness of the seru production system in which assembly and testing are carried out in configurable cells. Small, general purpose equipment is mounted on wheels, allowing cells to be created in response to demand. Seru has been used in the electronics industry in Japan to permit manufacturing close to product development. This thus gives an example of creating a smooth, swift flow by deploying capacity so as to respond to demand variability. As predicted by the TSEF, productivity increased with flow—and this took place even though demand variability was mitigated rather than reduced. The QRM Center focus, in contrast, has been on high-mix, low-volume products, often manufactured to order, and sometimes customized. Because this product profile does not lend itself to reduction of demand variability, a capacity buffer had to be installed at bottleneck operations in order to ensure a smooth flow. Demand variability can be a source of waste, but it can also be a source of profit and competitive advantage when it comes from meeting very specific customer needs that are only clearly defined soon before delivery. We then encouraged companies to divide variability according to whether or not it was a potential source of competitive advantage—whether or not it was strategic variability (Suri 2010). Building a strategy around demand variability often involves trading off efficiency for speed, thus cost for time. Our experience continues to be that the companies that we work with struggle to reduce lead times when it requires that time be prioritized over cost, and this limits their ability to gain leverage and profit from strategic variability. Helping companies to manage this trade-off has thus been a top focus for the QRM Center. Early in our journey, as we embarked on projects with numerous companies, it became clear that we would need to develop an appropriate time-based metric. We reached the same conclusion as Schmenner and Swink that delivery lead time—the time from when a customer places an order until when they receive it—would not be an appropriate metric for our purposes because it depends on the inventory that is in stock at the time of the order. We worked with our industry partners over several years to create a suitable metric with clear rules that we named Manufacturing Critical-path Time (MCT). MCT is defined as “the calendar time from when a customer submits an order, through the critical path, until the first end-item of that order is delivered to the customer.” (Suri 2014). Our measure is aligned with the recommendation in the TSEF to use throughput time, although MCT starts from order submission rather than processing of the first piece. In other words, we count all the order processing steps as part of the throughput time given the make-to-order nature of the high-mix, low-volume products. With this in mind, we also developed supporting QRM principles for office operations (such as estimating, quoting, order entry, and engineering), material planning and scheduling, and supply management (Suri 1998). Since the formalization of the MCT metric, all QRM implementations have been based on this metric. We do not claim that MCT is the optimal way to measure lead time, only that empirical evidence shows that it has been easy to use consistently and good enough to support QRM implementation. Our experience has been that deploying a consistent and precisely defined measurement approach has been essential if managers are to prioritize lead time in contexts in which it makes operations look less efficient. Also, the fact that all companies implementing QRM are making use of this measure makes it possible to compare results across companies. Although there are several precise and detailed rules to be observed in calculating MCT (see Suri 2014) we provide here an overview of the key concepts. As companies reduced their MCT significantly for a given set of products, they began to see substantial reductions in overall cost exactly as predicted by the TSEF. They also experienced quality improvements and major improvements in on-time delivery. The lessons learned, along with examples of key success stories, were documented in a second book (Suri 2010). [For readers not familiar with QRM, we recommend Suri (2010) as a starting point for understanding the details of this strategy]. In the following section, I describe how this played out in two QRM implementations. RenewAire is a small manufacturer of customized energy recovery ventilation systems, based in Waunakee, Wisconsin. In 2003, RenewAire was struggling to match supply with demand. Daily fire-fighting was required to get orders out on time, and many orders were late. Customers placed orders well in advance of delivery according to the company's quoted lead time, and RenewAire released these jobs into production on schedule—which should have been early enough to deliver on schedule. Unfortunately, however, it often turned out that the customers got a better idea of what exactly was needed as the delivery date approached, so requested changes to their orders. An architect for a building being constructed, for example, would use early drawings to estimate the size of the RenewAire air exchanger to be installed at the time when the RenewAire order needed to be placed. But, as construction began, drawings frequently evolved in a way that had implications for recovery ventilation. One architect, for example, proposed replacing one large air exchanger by two smaller units because the end customer gained a better understanding of how air exchange would affect building comfort. This required updating the order even though manufacturing had begun on the original order. This extra work and inventory increased bottleneck utilization, which increased manufacturing lead times still further. The president, Chuck Gates, had made an effort to reduce demand variability, but the fact was that the customer did not have sufficient information about what exactly was needed at the time they needed to place the order. And, it was the ability to provide the customer exactly what was needed that allowed RenewAire to compete profitably against much larger competitors offering a standard product. Interactions with the QRM Center led Mr. Gates to set as an objective the reduction of manufacturing lead time enough so that production could begin once the customer had a clear idea of their ventilation needs. The first step in reducing the manufacturing lead time was to reorganize the shop floor into cells, which is the starting point for a QRM reorganization and aligns completely with the TSEF recommendation. These cells were designed around market segments, so that each cell was focused on meeting the needs of a given set of customers, consistent with Schmenner and Swink's (1998) observation that cellular manufacturing provides a path to factory focus. Given that the objective was that each cell would have short enough manufacturing lead times to deliver on time even though production began after demand was known, management took steps to ensure that there was a 20% capacity buffer in each cell. While the capacity buffers did not need to be huge to ensure that waiting time at bottlenecks was minimized, they were large enough to make it look like efficiency on the shop floor was down and manufacturing cost was up. Mr. Gates therefore made the decision to replace efficiency and cost measures on the shop floor with MCT, such that MCT was the only measurement that was followed. This elimination of cost-based measures again follows precisely what the TSEF would have recommended. In less than a year, RenewAire had reduced its MCT by over 80%. In less than 5 years, the company increased revenue by 140%, taking business away from much larger competitors. Productivity increased, such that the headcount in manufacturing increased by only 70% during this time. Mr. Gates shared these results and described the increase in profit at the company at a QRM conference in 2015. Over two decades later, RenewAire continues to grow both by continuing to increase market share and by entering new markets. The small company that we started working with in 2003 is now considered an industry leader in energy recovery ventilation systems, and is known for its responsiveness. Mr. Gates retired several years ago, and a new and of operations are the this in RenewAire continues on the same The new support of to reduce lead time, even if they extra I a to a in a cell that makes for our ventilation that one machine would provide enough the are critical made to order for each I our to be if there was in the cell. I the of two to provide capacity and to these from our I that our ability to provide customers with exactly what they in a very short lead time, is a huge competitive for and I support that with of provides a key into how QRM has been over the long a of effort into making time-based part of the of our One we have used for this is to book as part of their new (Suri in small and once a to one at a time. top to this I lead the each and then we to the in a after the In the book has been key to our on and making time-based part of our As part of its QRM journey, also the set of that the TSEF, and its results provide strong empirical support for the of the is a small and of products, offering a for and profile and the time the QRM Institute in Belgium, the company had been an system with to manage its order flow. The of being had and had and customers were reductions in the time between order and delivery. These in inventory and increased lead one of the to QRM after a that I in organized manufacturing into cells around for enough capacity at bottlenecks to and made MCT their metric. also the production system on the shop which is to for high-mix, low-volume, or production (Suri In less than a year, the MCT for a major of was reduced from around to on-time delivery performance to The MCT of made it so that customers could place their order after their demand. As a of a major customer some of its from a to even though has the labor costs in the and The customer that short lead times and delivery an cost to the because of cost with to such as and and and time. the of the from the because of their to It has been a to reflect on how the more and approach developed in QRM aligns with the approach by JOM We that the of flow in a production process depends on sufficient It is by of production into cells that are focused around product We also observed from our QRM company and with TSEF that as of flow so does measures over measures of efficiency is to productivity more than a focus on the QRM experience provides strong evidentiary support for the theory that flow to We have also observed that companies that do prioritize time-based measures over measures of efficiency have in the capacity buffers at bottlenecks that are required to flow. QRM has developed in a high-mix, low-volume demand variability be a source of competitiveness and We have also observed that manufacturing in a has been for companies to for high-mix, low-volume products. In these the extra product enough to the increased capacity at bottleneck The TSEF that demand variability must be reduced in order to an even flow. the QRM I that this claim can be to that demand variability must be reduced to the capacity of the cellular to a even flow. This is consistent and the in Yin et al. on this me to claim that the path to even flow for further I that the QRM strategy and tools are a source of for these to the of manufacturing and operations and that our years of flow and productivity are to JOM this theory in I decades of experience and implementing It is essential that the JOM insights such as these into our and I several of in that I a of a of operations management and different to various customers responsiveness and short lead a competitive strategy that strategic variability is an rather than a While variability operations to it with the increase in cost and when this increase for profit can on variability rather than it to their advantage over QRM provides the for that in the of variability. variability need not be and to be it can be as a source of This the strategic focus from efficiency to effectiveness as the key of and it provides a of than or the strategy is but for must also well with that to provide process changes must increase that key of this is what and QRM provides a case in of the utilization or efficiency of on the flow of what customers the focus on and was also a large part of in The and and the theory of This way of continues to be and for a many and They it to how reducing the productivity of part of a process by its the productivity of the QRM provides of this important in QRM is its focus on the MCT which the time between order and of production with the production process flow time and the delivery lead time. This in metric the focus from reducing process to also reducing for order processing and and delivery to the This requires with and the of other business and the ability to work more an on production and time average time between the of capacity buffers for key While the of capacity at to variability and Suri the of capacity at bottlenecks as to variability. Indeed, organizations need more than one of and to and consistently by the delivery time, the of long times from production to customer is also important, first step in its These for empirical strategies work well the and and with various is the of the and how much is by the do different and and time affect and measurement have strategic such as to QRM, in of and much are various customers to for of and what are the for These are a of the that I Suri how the operations and process improvements on a strategic and that can look quite different as a In Schmenner and Swink (1998) published their article on TSEF. same year, Suri published book from different the in this are remarkably As Suri the principles have been to As long as flow requires that it be The both from the approach published here in JOM and the and approach in QRM was enthusiastically as by the Operations and Management this to the trade-off how flow is that between utilization and variability of demand and Flow can be a capacity buffer at the for low-volume, and customized products. decades later, although time-based has had some and I see this major as these manufacturing over the developed has to offering a reduced cost. The of manufacturing jobs has been to some have to around a new in many has and that The of manufacturing from to to has had important for the The has been that developed are better to than manufacturing to the cost of labor is are to working that would not be in the developed is and energy is of competitive manufacturing in the developed from QRM experience and from the seru approach described by Yin et al. (2017) and by Suri a path to manufacturing close to demand and but have not led to The of that has over these three decades has the objective of manufacturing from building the product that the customer to quantities of standard that enough to if the is production provides an has allowed to respond to changes in but has also in with major The standard clearly that when the operating is and the cost of the order to several times demand. The resulting inventory and with much in is not to it is to what is considered to be a potential And, the of in some does not from in other when there are The insights from QRM and TSEF out a path to to demand. than a of or shows a path to the that the customer to their QRM the competitive that from meeting low-volume demand. This has the of manufacturing into a operation that to deliver a product. As clearly by QRM and by the TSEF, this of manufacturing does not need to the of assembly with times and working but can rather the of cellular manufacturing in the cells that have been in QRM, or the configurable assembly and test cells that The work in such cells can be as as work in more operations like in and Although the cost of production to order to be than the cost from a a example that the created by to the decision about what to until demand is more than the cost for example, that demand at the for some product follows a with to with the cost from the only 10 per not during the demand is The is to standard demand. The resulting order from the is thus demand. demand is demand. The for the proposed order is This at and inventory at demand. The profit per of demand is to be compare this order to an order for the same product from a once demand is We the same profit if we the per to the And, this does not into other that are or with to or possible that are In the over more per we exchange a cost for a reduction in The insights thus make clear that to with a of that get into and end in We can make for which there is with production cost to that from the This supply does a better of meeting better of is to be and by only what is and production in a way that Schmenner JOM Forum article does a of the principles that lead to Center what is the set of in which to that of We should all that they It has only been a over a the assembly it was only about years before that when we the first flow were step in the of the they are very consistent with the that Suri in The of flow in business same our Suri is to and for this and for their time in on of Suri would like to three to focus the to the original and of the MCT they are on of Suri Suri would also like to the of and Suri down as QRM Center after the first 15 years as the they were for around of the 400 company projects in this The of

DOI
10.1002/joom.70005
Sources
openalex

Cite