← Search

Journal of Operations Management 1983

A heuristic algorithm for determining lot sizes of an item subject to regular and overtime production capacities

P. Dixon1,2; Mark Elder3; Graham K. Rand4; Edward A. Silver5

1 St. Mary's University · 2 Saint Mary's University · 3 University of Warwick · 4 Lancaster University · 5 University of Calgary

Abstract

The problem considered in this paper deals with the sizing and timing of replenishments for an item facing a time‐varying, but known, pattern of requirements. Regular time and overtime (the latter at a cost premium) production options are available where there are production capacities that also can vary with time. The problem is to establish the pattern of replenishments so as to keep the total of setup, carrying and overtime premium costs as low as possible without any backlogging of demand and without violating any of the capacity constraints. A heuristic procedure, simple enough to implement manually, is developed and tested on a large representative set of problems. The resulting performance is excellent, namely an average cost penalty of only 0.5%.

DOI
10.1016/0272-6963(83)90016-5
Sources
openalex

Cite