← Search

Production and Operations Management 2000

A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMES

T. C. E. Cheng1,2,3; Jatinder N.D. Gupta4,1,2,3; Guoqing Wang1,2,3,5

1 Hong Kong Polytechnic University · 2 Jinan University · 3 Ball State University · 4 Texas Tech University · 5 Operation PAR

Abstract

Flowshop scheduling problems with setup times arise naturally in many practical situations. This paper provides a review of static and deterministic flowshop scheduling research involving machine setup times. The literature is classified into four broad categories, namely sequence independent job setup times, sequence dependent job setup times, sequence independent family setup times, and sequence dependent family setup times. Using the suggested classification scheme, this paper organizes the flowshop scheduling literature involving setup and/or removal times and summarizes the existing research for different flowshop problem types. This review reveals that, while a considerable body of literature on this subject has been created, there still exist several potential areas worthy of further research.

DOI
10.1111/j.1937-5956.2000.tb00137.x
Sources
openalex

Cite