← Search

Production and Operations Management 2000

COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT, SINGLE‐ MACHINE PRODUCTION SYSTEM

Thomas Sloan1,2; J. George Shanthikumar3,4

1 University of Miami · 2 The University of Texas at Austin · 3 Université du Québec · 4 University of California, Berkeley

Abstract

Traditionally, the problems of equipment maintenance scheduling and production scheduling in a multi‐product environment have been treated independently. In this paper, we develop a Markov decision process model that simultaneously determines maintenance and production schedules for a multiple‐product, single‐machine production system, accounting for the fact that equipment condition can affect the yield of different product types differently. The problem was motivated by an application in semiconductor manufacturing. After examining structural properties of the optimal policy, we compare the combined method to an approach often used in practice. In the nearly 6,000 test problems studied, the reward from the combined method was an average of more than 25 percent greater than the reward from the traditional method.

DOI
10.1111/j.1937-5956.2000.tb00465.x
Sources
openalex

Cite