Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
37 results ✕ Clear filters

News and Notices

Management Science 1958
The Editors of Management Science believes that it would be of value to its readers to establish a section entitled RECENT ARTICLES OF INTEREST, which will consist of reviews or abstracts of relevant articles. In addition to the many journals published in the English language, we would like to provide coverage of journals printed in French, German, Spanish, Italian, Japanese, etc. Accordingly, we would welcome hearing from any individual interested in, and willing to read such foreign language journals, and who would submit a brief review or abstract of all articles that would be of interest to Management Science readers. Subscriptions to the respective journals would be provided for these reviewers.

A Computational Approach to the Economic Lot Scheduling Problem

Management Science 1958 4(3), 264-291
In practice, the economic lot quantity problem and the scheduling problem often are treated separately in production planning. However, when a number of items must be supplied continuously and the same means of production must be employed for several of the items non-concurrently, the “economic lot scheduling problem” may have to be dealt with. Addressing itself to a reduced version of this problem, the article outlines a computational approach to finding a feasible and minimum cost (set-up plus storage) production schedule for a group of items which must be available continuously though produced consecutively in a single production center.

The Theory of Search: Optimum Distribution of Search Effort

Management Science 1958 5(1), 44-50
This paper will be concerned with formulating the optimum allocation of search effort as a problem in convex programming so that their solutions may be made amenable to treatment by the adjacent extreme point methods of linear programming. Attention will be concentrated on discrete (statistical) distributions because this class of cases admits of the easiest and most straight-forward treatment. A sketch will then be given of how extensions may also be effected to continuous distributions.

Dynamic Version of the Economic Lot Size Model

Management Science 1958 5(1), 89-96
A forward algorithm for a solution to the following dynamic version of the economic lot size model is given: allowing the possibility of demands for a single item, inventory holding charges, and setup costs to vary over N periods, we desire a minimum total cost inventory management scheme which satisfies known demand in every period. Disjoint planning horizons are shown to be possible which eliminate the necessity of having data for the full N periods.

Development and Evaluation of Surveillance Sampling Plans

Management Science 1958 5(1), 72-88
The problem of maintaining quality of inventory in the presence of deterioration is studied. Repeated application of sampling inspections together with replacement policies are used to maintain quality. The effect of such repeated applications can be measured in terms of the proportion of poor product existing at any time. In this paper, the sampling plans studied are those commonly used in acceptance sampling, and the replacement policy consists in replacing lots judged defective by the sampling procedure. The theory of Markov processes is used to evaluate the effectiveness of the sampling plans and replacement policy. As illustrations, special cases are considered. Graphs are provided for these cases.

A Linear Programming Approach to the Chemical Equilibrium Problem

Management Science 1958 5(1), 38-43
The well known chemical equilibrium problem is expressed in the form of minimizing the free energy of a mixture in order to compute the chemical composition at equilibrium. By piece-wise linear approximations to the free energy function, the problem becomes a linear program which can be solved by a standard code on a computing machine. Successive approximations give any degree of accuracy.

Some Observations on the Business School of Tomorrow

Management Science 1958 4(4), 351-364
Business school training needs to consider the managerial needs of a quarter century hence. This implies greater emphasis in designing business school curricula and teaching methods on the development of fundamental analytical tools and on the use of these tools in identifying, solving, and implementing decisions on managerial problems. Fundamental analytical tools will come especially from the behavioral sciences, economics, and quantitative methods (including the use of mathematics). The “applied” fields of business (marketing, production, finance, and so on) should, at least now, be viewed primarily as important problem areas where best solutions depend on the effective application of such fundamental tools. This approach implies elimination of much of the current subject matter of business school curricula.

The Use of a Large Scale Computer for Manufacturing Control

Management Science 1958 4(2), 177-182
Considerations which led to the selection of scientific Computers in preference to a business machine Data Processor for the preparation of Shop Orders, Scheduling and Control of Stock Status. Problems faced relative to the use of scientific Computers to handle large volumes of input and output data. Practical operating difficulties faced in the joint use of a Computer by Engineering and Accounting personnel. Problems encountered in attempting to capitalize to the maximum on the computer's potential capabilities. Advantage of having the programming and coding of a problem vested in one group of personnel. Management benefits accruing from the use of the Computer.

A Linear Programming Model of Integrated Iron and Steel Production

Management Science 1958 4(4), 415-449
Integrated steel mills usually have a choice over the use of various materials and production processes. Different ores may be used in the production of iron; steel scrap and iron can be used in different proportions in the production of steel. The economical usage rate of all materials is a function of numerous variables, among which the market price of some materials, notably of various grades of steel scrap, fluctuates and therefore requires a periodic determination of the economical usage rate. This is a typical problem for programming. The paper presents a mathematical formulation of the stages of iron and steel production to determine the optimal (least cost) rate of input of materials. The models of the various stages of production are connected to form a “master model” of an integrated steel mill.