Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1381 results ✕ Clear filters

Irregular workloads with MRP systems: Some causes and consequences

Journal of Operations Management 1983
Material Requirements Planning (MRP) systems have been widely applied in industry to better manage multiproduct, multistage production environments. Although many applications have been quite successful, much is still left to the planner's intuition as to how to assure that master schedules, component lot sizes, and priorities realistically conform to the capacity limits at individual work centers. Capacity issues may indeed be the soft spot in MRP logic. This paper explores some possible causes of irregular workload patterns when using an MRP system. Better insight on which factors cause temporary bottlenecks could help managers better assess the vulnerability of their plants to this problem. It might also suggest ways of dampening peaks and valleys. The problem setting is a multistage environment; several products are made from various subassemblies and parts. Each shop order is routed through one or more capacitated work centers. An order is delayed either by temporary capacity shortages or the unavailability of components. Of course, the second delay can be caused by capacity problems previously encountered by the shop orders of its components. Seven experimental factors are tested with a large‐scale simulator, and five performance measures are analyzed. The factors are the number of levels in the bill of material, the average load on the shop, the average lot size, the choice of priority rule, demand variability, the use of a gateway department, and the degree of equipment specialization. We have one measure of customer service, two for inventory, and two for workload. The workload measures are unconventional, since our interest is when workload variability occurs and how it affects inventory and customer service. The simulator has been developed over the course of eight years, and since this study has been further enhanced to handle many more factors. The simulator was validated recently with real data at two manufacturing plants. It is quite general, in that the bills of material, shop configuration, routings, worker efficiencies, and operating rules can be changed as desired. An initial screening experiment was performed, whereupon the average load and priority rules were not statistically significant at even the .05 level. A full factorial analysis with two replications was then conducted on the five remaining factors. Multivariate analysis of variance (MANOVA) and analysis of variance (ANOVA) statistical tests have been performed. The results confirm that workload variability can have a detrimental impact on customer service and inventory. The following structural changes to the manufacturing system can be beneficial, but tend to be more difficult to achieve. More BOM levels improve customer service, but increase inventory and capacity bottlenecks. Resource flexibility is a powerful tool to reduce workload variability. Capacity slack averaging much over 10% is wasteful, having no benefits for inventory and customer service. In general, revising the routing patterns only, such as creating more dominant paths, will not give big payoffs. The following procedural changes are easier to implement. Master schedules which smooth aggregate resources are an excellent device to reduce workload variability. Even with a smooth MPS, debilitating workload variability can still occur due to the design of the BOM, lot size, and leadtime offset parameters. Selecting a priority rule does not seem to be of overriding importance compared to master scheduling and component lot sizing. These findings must be considered within the context of the range of plant environments encompassed by this study.

The effects of workforce strategies on manufacturing operations

Journal of Operations Management 1983
This paper tests the effects of three workforce strategies on a multistage, multiproduct manufacturing system under various operating conditions. These three strategies are those that are predominant in today's world economics. One type is a chase strategy, often used by firms that employ low skilled workers and faced with seasonal product demands, where workforce levels fluctuate according to increases and decreases in production requirements. A level‐flexible strategy, commonly called the Toyota system, keeps the aggregate workforce at a constant size but by having flexibly trained workers it can allow transfers of workers between various departments and processes as production requirements dictate. The third major type is a level‐inflexible strategy, such as that used on mass‐assembly lines employed by American automobile manufacturers. Under this strategy, the number of workers remains constant in each department as well as at the aggregate level regardless of short term changes in the production requirements. The manufacturing system is envisioned as a sequential planning process with interrelated decisions made at the levels of aggregate planning, master production scheduling, and departmental planning. This process is modeled as a zero‐one mixed integer program. The operating conditions under which the strategies are tested are the variability of demand, the level of service, and the degree of inventory investment. The strategies are statistically tested as to their effects on five criteria: average weekly workforce size, average quarterly inventory investment, average weekly overtime, total setups and the average weekly ratio of departmental load to capacity. Using four different products and an experimental manufacturing environment described within the paper, we tested for any statistical differences between the three strategies. We found that none of the strategies had significantly different workforce sizes. Also, the chase strategy had the smallest average quarterly inventory investment. This implies that the “Japanese” level‐inflexible strategy does not have the smallest workforce or lowest inventory as claimed by some. We also tested the effects of the operating conditions on the workforce strategies. The level‐flexible strategy was most insulated from the seasonality, inventory restrictions, and service level. Thus again the claims made for the level‐inflexible strategy about being insulated from its environment were not substantiated. It was found that the seasonality of demand had the greatest impact on the three workforce strategies. Also, the level of service greatly affected the utilization of labor resources. The major overall conclusion is that the level‐flexible strategy which is associated with some Japanese manufacturing firms does not achieve the claims that some of its adherents have made for it. It does not have the smallest workforce or the lowest inventory nor is it best insulated from its environment. Furthermore, the seasonality of demand and the level of service do effect this strategy.

The part‐period balancing algorithm and its look ahead‐look back feature: A theoretical and experimental analysis of a single stage lot‐sizing procedure

Journal of Operations Management 1983
This paper investigates the discrete Part‐Period Balancing (PPB) lot‐sizing algorithm and its optional feature, the Look Ahead‐Look Back tests. PPB is the most commonly used dynamic lot‐sizing procedure in practice and it has also been tested extensively in simulation experiments. Although its overall cost performance, relative to other heuristics, have been fairly good, a fundamental flaw with the model has been noted in the literature. This deficiency leads to poor performance under certain conditions. In this paper a simple adjustment to the main algorithm is analytically derived under the assumptions of a constant demand rate and an infinite planning horizon. The adjustment leads to an optimal behavior for the PPB heuristic under the stated conditions. Subsequent experimental analysis through simulation of lot‐sizing performance in environments with time‐varying, discrete demand shows that the proposed adjustment leads to significant cost reductions. This paper also analyzes the Look Ahead‐Look Back tests which is the distinguishing feature between the PPB procedure and the Least Total Cost algorithm. The tests were devised to improve the cost performance of the PPB heuristic by marginally adjusting each tentative lot‐size. The effect of the Look Ahead‐Look Back tests have, however, never been verified in the literature. The tests have undergone some changes over time, when they have been included in commercial software packages for inventory management. We suggest yet another modified version in this paper. In the last portion of the paper, the cost effectiveness of the Look Ahead‐Look Back tests is confirmed through simulation. That is, when used together with the original PPB procedure, they lead to an improved cost performance. It is also shown that a combination of these tests and the adjustment to the PPB procedure mentioned earlier leads to an even lower average total cost. All cost improvements are statistically significant. It is finally noted that the Look Ahead‐Look Back tests perform poorly in certain constant demand situations. Additional analytic and experimental analysis shows that these results stem from a dominance of the Look Back test over the Look Ahead test, leading to the former test being performed more often. This can easily be corrected, however, by checking for sufficient variability in the data before the Look Back test is employed.

A heuristic algorithm for determining lot sizes of an item subject to regular and overtime production capacities

Journal of Operations Management 1983
The problem considered in this paper deals with the sizing and timing of replenishments for an item facing a time‐varying, but known, pattern of requirements. Regular time and overtime (the latter at a cost premium) production options are available where there are production capacities that also can vary with time. The problem is to establish the pattern of replenishments so as to keep the total of setup, carrying and overtime premium costs as low as possible without any backlogging of demand and without violating any of the capacity constraints. A heuristic procedure, simple enough to implement manually, is developed and tested on a large representative set of problems. The resulting performance is excellent, namely an average cost penalty of only 0.5%.

Learning curves and lot sizing for independent and dependent demand

Journal of Operations Management 1983
This paper explores the effect of learning curve cost behavior, as opposed to linear, on lot sizing. The first portion of the paper develops optimizing models for the independent demand situation. The second portion examines lot sizing for dependent demand, developing a lot sizing rule similar to Part Period Balancing. After examining the shortcomings of previous attempts at the independent demand lot sizing problem, two models are derived. Excluding material costs (for an assembly operation, the cost of all components), the optimal lot size is seen to vary linearly with demand and inversely with the carrying cost rate. When material costs are included a smaller optimal lot size is derived. The difference between the two, expressed as a fraction of the smaller lot size, equals the material/labor ratio of the last unit produced in the smaller lot size. For dependent demand, the incremental model developed by Freeland and Colley as an improvement on Part Period Balancing is used as a beginning concept. An analogous model, called Assembly Period Balancing, is developed for learning curve cost behavior. The decision rule for combining lots is expressed as a comparison of the material/labor ratio of the lot considered for combining with another expression involving the carrying cost rate, relative lot size and the learning curve exponent. Finally, cost data from an electronics manufacturer are used to examine the cost penalties of failing to recognize learning curve cost behavior. It is shown that optimal lot sizes for learning curve costs can be much larger than those obtained assuming linear costs. It is also shown that much larger lots can be economically combined in the dependent demand case when costs follow a learning curve.

Relearning from the old masters: Lessons of the American System of Manufacturing

Journal of Operations Management 1983
Nineteenth and early twentieth century America witnessed the development of a spectacularly successful manufacturing infrastructure that propelled the United States into the forefront of the world's economic powers. The “American System of Manufacturing, ” a term once used exclusively by historians to describe the progress of the firearms and other light metalworking industries in early nineteenth century New England, has been recast in this paper to describe the advances in management practice, work force attitudes, and process technology that characterized American industry from 1800 through the 1930s. The managers responsible for building the American System of Manufacturing addressed themselves to the extraordinary opportunities made possible in their day by an unprecedented season of technological ferment. Their insights and managerial responses, which are the focus of this paper, led to the establishment of product quality and reliability, and excellence in technology‐driven manufacturing, as the cornerstones of American industry. The comfortable maturity into which American industry drifted during the 1950s and 1960s disrupted the evolutionary progress of the American System. Confident that the age‐old “problem of production” was firmly in check, American managers redirected their efforts away from the shop floor and towards marketing and finance. The ensuing absence of innovation in product and process innovation, and in the management of the work force, created a competitive vacuum that has been exploited by aggressive foreign producers. The heightened challenge to America's basic industries posed by these foreign competitors has induced lengthy debate among academics, industry officials, and practicing managers, concerning the steps that need to be taken to redress America's declining industrial capacity. Our contribution to this re‐examination has two objectives. First, we will attempt both to categorize the types of management issues and production problems that since 1800 have confronted American managers, and to identify the practical responses these issues elicited. Second, we will combine the insight garnered from our historical examination with our knowledge of contemporary management issues to detail the lessons of the American System and to identify areas in the realm of production and operations management where change is most needed. Our inquiry has revealed that changes in the character of American industry occurred as workers and managers instituted new approaches to better manage technology. The succession began with the concept of manufacturing as a sequential flow process. Later, this basic notion was expanded as managers used advances in both process and product technology to provide for the competitive continuity of their firms. The rapid pace of technological diffusion in nineteenth century America not only fostered the growth of external, technology‐based suppliers, but also complicated the task of production management by requiring firms to coordinate their internal resources with the actions of suppliers. This change necessitated, of course, that managers keep abreast of a bewildering array of changes in production and process technology. The management developments that emerged in response to the appearance of technology‐oriented suppliers were the most advanced expressions of American manufacturing at the end of the nineteenth century. These advances are of interest to us for yet another reason, however, because the existence of a skilled manufacturing infrastructure helped prepare the ground for the first generation of automobile manufacturing. Although the first car producers were by and large assemblers who put together in rented shops components supplied by others, their efforts rested on a, by then, well‐developed and widely diffused competence in manufacturing. Only because a host of other non‐automotive shops and companies had mastered the full range of skills, technical and organizational, pioneered during the nineteenth century, could the first generation of work on automobiles proceed. Driven by the scale economies associated with capital‐intensive, high‐volume operations, relationships between auto producers and suppliers shifted in focus and emphasis as the car industry matured. In particular, the growing requirements of specialization and coordination in the auto industry demanded an increasingly bureaucratic form of organization and, by extension, the development of managerial skills appropriate to that form. The mastery of a genuine “flow” system of production at high‐volume levels defined the organizational competence on which would rest the great manufacturing achievements of twentieth century American industry. With the development of a dominant product design and the production base responsible for building it, American industry had by the outbreak of World War II achieved unquestioned dominance in the work of manufacturing. Or had it? Industry certainly thought so for the post‐war decades were to see a redirection of effort away from production management. The search for greener managerial pastures left untapped, however, the potential to be reached by diligent and relentless concentration on the work of production, and obscured gains attainable from better training and utilization of the work force. The task now facing American producers in a hotly contested global struggle for industrial ascendancy is to begin to understand and to extend the lessons that emerge from their now dormant industrial heritage.

Currently practiced formulations for the assembly line balance problem

Journal of Operations Management 1983
New formulations for the assembly line balance problem are proposed based on interviews and surveys of practicing engineers. These formulations are the basis for a model in goal programming form. A branch‐and‐bound algorithm is developed which can solve the model for an optimum solution. Computational studies show that computer run time is very modest for moderate size problems. Interviews and a survey of practicing engineers were used to develop a list of goals or constraints germane to the assembly line balance problem. These included minimizing working areas or employees, making sure tasks assigned to a station do not exceed the cycle time, and adhering to sequence constraints. These constraints are included in most traditional models. However, additional goals were mentioned. These included avoiding changes in workload assigned to a work area, adhering to layout requirements of the plant, making combinations of tasks interesting, avoiding the combination of physiologically demanding tasks, etc. The additional goals above are incorporated in a new formulation for the assembly line balance problem. This formulation is in goal programming form. The goal programming model attempts to minimize deviations from goals. If deviations are necessary, lowest ranked goals are violated first. The objective function of the model is based on an ordinal ranking of goals only. The survey mentioned above showed that engineers did not find it difficult to rank the importance of goals. The proposed goal programming model is a mixed integer linear program. Previous studies have shown that cutting plane and implicit enumeration techniques are inferior to branch‐and‐bound algorithms. A branch‐and‐bound method, called GoalOriented Algorithm for Line Balance (GOAL), is developed to solve the formulations proposed in the paper. GOAL was computationally tested with 50 problems. These problems varied in size from 4 to 35 tasks. One of the problems was an engine cradle assembly problem encountered by an automobile manufacturer. Computer run times appeared reasonable. For example, the engine cradle problem 35 tasks) required only 16.3 seconds CPU on the DEC PDF 11/70 at California State University, Northridge. GOAL's execution time appeared linearly proportional to the number of tasks required for most problems.

Job shop scheduling with modified due dates

Journal of Operations Management 1983
This paper introduces a new dispatching rule to job shop scheduling, extending earlier results to a multi‐machine environment. This new rule, which uses modified due dates is compared to other popular dispatching methods over a range of due date tightnesses at two utilization levels. The results for mean tardiness indicate that the modified operation due date (MOD) rule compares very favorably with other prominent dispatching methods. The modified due date is a job's original due date or its early finish time, whichever is larger. For an individual operation, it is the operation's original due date or the operation's early finish time, whichever is larger. A comparison of the job‐based version with the operation‐based version indicated that the operation‐based version tended to be more effective at meeting due dates. The main performance measure was mean job tardiness, although the proportion of tardy jobs was also reported, and the two measures together imply the conditional mean tardiness. The MOD rule was compared to several well‐known tardiness‐oriented priority rules, such as minimum slack‐per‐operation (S/OPN), smallest critical ratio (SCR), and COVERT. The MOD rule tended to achieve lower levels of mean tardiness than the other rules, except under conditions where due dates were quite loose. In this situation, very little tardiness occurs for any of the rules. The MOD rule appeared to be more robust than the other rules to changes in the tightness of due dates, and similar results occurred at both high and low utilizations.

Scheduling of re‐entrant flow shops

Journal of Operations Management 1983
We propose and develop a scheduling system for a very special type of flow shop. This flow shop processes a variety of jobs that are identical from a processing point of view. All jobs have the same routing over the facilities of the shop and require the same amount of processing time at each facility. Individual jobs, though, may differ since they may have different tasks performed upon them at a particular facility. Examples of such shops are flexible machining systems and integrated circuit fabrication processes. In a flexible machining system, all jobs may have the same routing over the facilities, but the actual tasks performed may differ; for instance, a drilling operation may vary in the placement or size of the holes. Similarly, for integrated circuit manufacturing, although all jobs may follow the same routing, the jobs will be differentiated at the photolithographic operations. The photolitho‐graphic process establishes patterns upon the silicon wafers where the patterns differ according to the mask that is used. The flow shop that we consider has another important feature, namely the job routing is such that a job may return one or more times to any facility. We say that when a job returns to a facility it reenters the flow at that facility, and consequently we call the shop a re‐entrant flow shop. In integrated circuit manufacturing, a particular integrated circuit will return several times to the photolithographic process in order to place several layers of patterns on the wafer. Similarly, in a flexible machining system, a job may have to return to a particular station several times for additional metal‐cutting operations. These re‐entrant flow shops are usually operated and scheduled as general job shops, ignoring the inherent structure of the shop flow. Viewing such shops as job shops means using myopic scheduling rules to sequence jobs at each facility and usually requires large queues of work‐in‐process inventory in order to maintain high facility utilization, but at the expense of long throughput times. In this paper we develop a cyclic scheduling method that takes advantage of the flow character of the process. The cycle period is the inverse of the desired production rate (jobs per day). The cyclic schedule is predicated upon the requirement that during each cycle the shop should perform all of the tasks required to complete a job, although possibly on different jobs. In other words, during a cycle period we require each facility to do each task assigned to it exactly once. With this requirement, a cyclic schedule is just the sequencing and timing on each facility of all of the tasks that that facility must perform during each cycle period. This cyclic schedule is to be repeated by each facility each cycle period. The determination of the best cyclic schedule is a very difficult combinatorial optimization problem that we cannot solve optimally for actual operations. Rather, we present a computerized heuristic procedure that seems very effective at producing good schedules. We have found that the throughput time of these schedules is much less than that achievable with myopic sequencing rules as used in a job shop. We are attempting to implement the scheduling system at an integrated circuit fabrication facility.