Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1801 results ✕ Clear filters

A heuristic algorithm for determining lot sizes of an item subject to regular and overtime production capacities

Journal of Operations Management 1983
The problem considered in this paper deals with the sizing and timing of replenishments for an item facing a time‐varying, but known, pattern of requirements. Regular time and overtime (the latter at a cost premium) production options are available where there are production capacities that also can vary with time. The problem is to establish the pattern of replenishments so as to keep the total of setup, carrying and overtime premium costs as low as possible without any backlogging of demand and without violating any of the capacity constraints. A heuristic procedure, simple enough to implement manually, is developed and tested on a large representative set of problems. The resulting performance is excellent, namely an average cost penalty of only 0.5%.

Learning curves and lot sizing for independent and dependent demand

Journal of Operations Management 1983
This paper explores the effect of learning curve cost behavior, as opposed to linear, on lot sizing. The first portion of the paper develops optimizing models for the independent demand situation. The second portion examines lot sizing for dependent demand, developing a lot sizing rule similar to Part Period Balancing. After examining the shortcomings of previous attempts at the independent demand lot sizing problem, two models are derived. Excluding material costs (for an assembly operation, the cost of all components), the optimal lot size is seen to vary linearly with demand and inversely with the carrying cost rate. When material costs are included a smaller optimal lot size is derived. The difference between the two, expressed as a fraction of the smaller lot size, equals the material/labor ratio of the last unit produced in the smaller lot size. For dependent demand, the incremental model developed by Freeland and Colley as an improvement on Part Period Balancing is used as a beginning concept. An analogous model, called Assembly Period Balancing, is developed for learning curve cost behavior. The decision rule for combining lots is expressed as a comparison of the material/labor ratio of the lot considered for combining with another expression involving the carrying cost rate, relative lot size and the learning curve exponent. Finally, cost data from an electronics manufacturer are used to examine the cost penalties of failing to recognize learning curve cost behavior. It is shown that optimal lot sizes for learning curve costs can be much larger than those obtained assuming linear costs. It is also shown that much larger lots can be economically combined in the dependent demand case when costs follow a learning curve.

Relearning from the old masters: Lessons of the American System of Manufacturing

Journal of Operations Management 1983
Nineteenth and early twentieth century America witnessed the development of a spectacularly successful manufacturing infrastructure that propelled the United States into the forefront of the world's economic powers. The “American System of Manufacturing, ” a term once used exclusively by historians to describe the progress of the firearms and other light metalworking industries in early nineteenth century New England, has been recast in this paper to describe the advances in management practice, work force attitudes, and process technology that characterized American industry from 1800 through the 1930s. The managers responsible for building the American System of Manufacturing addressed themselves to the extraordinary opportunities made possible in their day by an unprecedented season of technological ferment. Their insights and managerial responses, which are the focus of this paper, led to the establishment of product quality and reliability, and excellence in technology‐driven manufacturing, as the cornerstones of American industry. The comfortable maturity into which American industry drifted during the 1950s and 1960s disrupted the evolutionary progress of the American System. Confident that the age‐old “problem of production” was firmly in check, American managers redirected their efforts away from the shop floor and towards marketing and finance. The ensuing absence of innovation in product and process innovation, and in the management of the work force, created a competitive vacuum that has been exploited by aggressive foreign producers. The heightened challenge to America's basic industries posed by these foreign competitors has induced lengthy debate among academics, industry officials, and practicing managers, concerning the steps that need to be taken to redress America's declining industrial capacity. Our contribution to this re‐examination has two objectives. First, we will attempt both to categorize the types of management issues and production problems that since 1800 have confronted American managers, and to identify the practical responses these issues elicited. Second, we will combine the insight garnered from our historical examination with our knowledge of contemporary management issues to detail the lessons of the American System and to identify areas in the realm of production and operations management where change is most needed. Our inquiry has revealed that changes in the character of American industry occurred as workers and managers instituted new approaches to better manage technology. The succession began with the concept of manufacturing as a sequential flow process. Later, this basic notion was expanded as managers used advances in both process and product technology to provide for the competitive continuity of their firms. The rapid pace of technological diffusion in nineteenth century America not only fostered the growth of external, technology‐based suppliers, but also complicated the task of production management by requiring firms to coordinate their internal resources with the actions of suppliers. This change necessitated, of course, that managers keep abreast of a bewildering array of changes in production and process technology. The management developments that emerged in response to the appearance of technology‐oriented suppliers were the most advanced expressions of American manufacturing at the end of the nineteenth century. These advances are of interest to us for yet another reason, however, because the existence of a skilled manufacturing infrastructure helped prepare the ground for the first generation of automobile manufacturing. Although the first car producers were by and large assemblers who put together in rented shops components supplied by others, their efforts rested on a, by then, well‐developed and widely diffused competence in manufacturing. Only because a host of other non‐automotive shops and companies had mastered the full range of skills, technical and organizational, pioneered during the nineteenth century, could the first generation of work on automobiles proceed. Driven by the scale economies associated with capital‐intensive, high‐volume operations, relationships between auto producers and suppliers shifted in focus and emphasis as the car industry matured. In particular, the growing requirements of specialization and coordination in the auto industry demanded an increasingly bureaucratic form of organization and, by extension, the development of managerial skills appropriate to that form. The mastery of a genuine “flow” system of production at high‐volume levels defined the organizational competence on which would rest the great manufacturing achievements of twentieth century American industry. With the development of a dominant product design and the production base responsible for building it, American industry had by the outbreak of World War II achieved unquestioned dominance in the work of manufacturing. Or had it? Industry certainly thought so for the post‐war decades were to see a redirection of effort away from production management. The search for greener managerial pastures left untapped, however, the potential to be reached by diligent and relentless concentration on the work of production, and obscured gains attainable from better training and utilization of the work force. The task now facing American producers in a hotly contested global struggle for industrial ascendancy is to begin to understand and to extend the lessons that emerge from their now dormant industrial heritage.

The use of workload information to control job lateness in controlled and uncontrolled release production systems

Journal of Operations Management 1983 open access
The performance of a workload dependent scheduling and due date assignment rule is investigated. The rule uses time‐phased workload information and time‐phased capacity information. Performance comparisons are made with a rule that uses only time‐aggregated workload information. The performance for two methods of releasing jobs to the shop is investigated: an uncontrolled method where the jobs are released at random, and a controlled method where jobs are released to maintain a specific workload norm. Computer simulation is used as the research tool. The mean and standard deviation of lateness are used as performance measures. The results indicate that the use of time‐phased workload information may decrease the variance of the lateness, as compared with the use of time‐aggregated workload information only. However, the magnitude of the effect depends on the type of sequencing rule used. Furthermore, if time‐phased information is used, control of the mean lateness requires that the amount of capacity available for loading used in the loading procedure differs from the amount of capacity actually available for production. It is shown that by selecting adequate parameter values, both a constant mean lateness and a small variance of lateness can be obtained with this type of assignment rule. These results are valid for both types of release situations. So even in the case where the workload of the shop is under strict control, and the mean operation flow time does not, therefore, vary, the use of time‐phased workload information can decrease the variance of the lateness.

Currently practiced formulations for the assembly line balance problem

Journal of Operations Management 1983
New formulations for the assembly line balance problem are proposed based on interviews and surveys of practicing engineers. These formulations are the basis for a model in goal programming form. A branch‐and‐bound algorithm is developed which can solve the model for an optimum solution. Computational studies show that computer run time is very modest for moderate size problems. Interviews and a survey of practicing engineers were used to develop a list of goals or constraints germane to the assembly line balance problem. These included minimizing working areas or employees, making sure tasks assigned to a station do not exceed the cycle time, and adhering to sequence constraints. These constraints are included in most traditional models. However, additional goals were mentioned. These included avoiding changes in workload assigned to a work area, adhering to layout requirements of the plant, making combinations of tasks interesting, avoiding the combination of physiologically demanding tasks, etc. The additional goals above are incorporated in a new formulation for the assembly line balance problem. This formulation is in goal programming form. The goal programming model attempts to minimize deviations from goals. If deviations are necessary, lowest ranked goals are violated first. The objective function of the model is based on an ordinal ranking of goals only. The survey mentioned above showed that engineers did not find it difficult to rank the importance of goals. The proposed goal programming model is a mixed integer linear program. Previous studies have shown that cutting plane and implicit enumeration techniques are inferior to branch‐and‐bound algorithms. A branch‐and‐bound method, called GoalOriented Algorithm for Line Balance (GOAL), is developed to solve the formulations proposed in the paper. GOAL was computationally tested with 50 problems. These problems varied in size from 4 to 35 tasks. One of the problems was an engine cradle assembly problem encountered by an automobile manufacturer. Computer run times appeared reasonable. For example, the engine cradle problem 35 tasks) required only 16.3 seconds CPU on the DEC PDF 11/70 at California State University, Northridge. GOAL's execution time appeared linearly proportional to the number of tasks required for most problems.

Job shop scheduling with modified due dates

Journal of Operations Management 1983
This paper introduces a new dispatching rule to job shop scheduling, extending earlier results to a multi‐machine environment. This new rule, which uses modified due dates is compared to other popular dispatching methods over a range of due date tightnesses at two utilization levels. The results for mean tardiness indicate that the modified operation due date (MOD) rule compares very favorably with other prominent dispatching methods. The modified due date is a job's original due date or its early finish time, whichever is larger. For an individual operation, it is the operation's original due date or the operation's early finish time, whichever is larger. A comparison of the job‐based version with the operation‐based version indicated that the operation‐based version tended to be more effective at meeting due dates. The main performance measure was mean job tardiness, although the proportion of tardy jobs was also reported, and the two measures together imply the conditional mean tardiness. The MOD rule was compared to several well‐known tardiness‐oriented priority rules, such as minimum slack‐per‐operation (S/OPN), smallest critical ratio (SCR), and COVERT. The MOD rule tended to achieve lower levels of mean tardiness than the other rules, except under conditions where due dates were quite loose. In this situation, very little tardiness occurs for any of the rules. The MOD rule appeared to be more robust than the other rules to changes in the tightness of due dates, and similar results occurred at both high and low utilizations.

Scheduling of re‐entrant flow shops

Journal of Operations Management 1983
We propose and develop a scheduling system for a very special type of flow shop. This flow shop processes a variety of jobs that are identical from a processing point of view. All jobs have the same routing over the facilities of the shop and require the same amount of processing time at each facility. Individual jobs, though, may differ since they may have different tasks performed upon them at a particular facility. Examples of such shops are flexible machining systems and integrated circuit fabrication processes. In a flexible machining system, all jobs may have the same routing over the facilities, but the actual tasks performed may differ; for instance, a drilling operation may vary in the placement or size of the holes. Similarly, for integrated circuit manufacturing, although all jobs may follow the same routing, the jobs will be differentiated at the photolithographic operations. The photolitho‐graphic process establishes patterns upon the silicon wafers where the patterns differ according to the mask that is used. The flow shop that we consider has another important feature, namely the job routing is such that a job may return one or more times to any facility. We say that when a job returns to a facility it reenters the flow at that facility, and consequently we call the shop a re‐entrant flow shop. In integrated circuit manufacturing, a particular integrated circuit will return several times to the photolithographic process in order to place several layers of patterns on the wafer. Similarly, in a flexible machining system, a job may have to return to a particular station several times for additional metal‐cutting operations. These re‐entrant flow shops are usually operated and scheduled as general job shops, ignoring the inherent structure of the shop flow. Viewing such shops as job shops means using myopic scheduling rules to sequence jobs at each facility and usually requires large queues of work‐in‐process inventory in order to maintain high facility utilization, but at the expense of long throughput times. In this paper we develop a cyclic scheduling method that takes advantage of the flow character of the process. The cycle period is the inverse of the desired production rate (jobs per day). The cyclic schedule is predicated upon the requirement that during each cycle the shop should perform all of the tasks required to complete a job, although possibly on different jobs. In other words, during a cycle period we require each facility to do each task assigned to it exactly once. With this requirement, a cyclic schedule is just the sequencing and timing on each facility of all of the tasks that that facility must perform during each cycle period. This cyclic schedule is to be repeated by each facility each cycle period. The determination of the best cyclic schedule is a very difficult combinatorial optimization problem that we cannot solve optimally for actual operations. Rather, we present a computerized heuristic procedure that seems very effective at producing good schedules. We have found that the throughput time of these schedules is much less than that achievable with myopic sequencing rules as used in a job shop. We are attempting to implement the scheduling system at an integrated circuit fabrication facility.

The effects of work‐in‐process inventory considerations on learning curve construction

Journal of Operations Management 1982
Learning curves have been used since the 1930's as a tool to aid in the functions of cost estimating and production planning / control. While there has been much data collected to construct learning curves for airplanes, extensive coll ection of data to construct curves for electronic equipment has been limited. Further, virtually all published analyses to date have implicitly ignored the effects of work‐in‐process inventories on curve construction. This paper examines these effects through the historical construction of learning curves using actual industrial data. Work‐in‐process effects are considered through the use of linear and bilinear manufacturing progress functions. Degradation in the accuracy of curve construction is determined through the completion of a sensitivity analysis considering varying degrees of work‐in‐process activity. The results of the analysis show that work‐in‐process consideration affects the improvement curve percentage obtained. The method of work‐in‐process consideration is found to be less critical than the basic inclusion of this parameter in curve construction by one of several straightforward mathematical methods.