The impact of time‐based manufacturing practices on mass customization and value to customer

Journal of Operations Management 2001
Mass customization capabilities enable firms to design, produce, and deliver a high volume of differentiated products that meet specific customer needs in a timely manner and at close to mass‐production prices. A critical part of mass customization is simultaneously achieving customer responsiveness, cost efficiency, and high volume production in the manufacturing system. This research describes mass customization and provides a framework to understand the relationships among time‐based manufacturing practices, mass customization, and value to the customer. It involves the development of an instrument to measure mass customization. Data were collected from 303 manufacturing firms of various size, location, and industry to develop the instrument and test the relationships in the framework. The primary research method was structural equation modeling using LISREL. The study indicates that firms with high levels of time‐based manufacturing practices have high levels of mass customization and value to the customer. Also, firms with high levels of mass customization have high levels of value to customer.

On the merits and pitfalls of critical chain scheduling

Journal of Operations Management 2001
The direct application of the Theory of Constraints (TOC) to project management, known as Critical Chain Scheduling and Buffer Management (CC/BM), has recently emerged as one of the most popular approaches to project management. It is the objective of this paper to highlight the merits and pitfalls of the CC/BM scheduling approach. Following a short overview of the fundamentals of CC/BM, the strengths and weaknesses of the approach are put into perspective, based on a critical analysis of the literature as well as our own experimentation with commercial CC/BM software. The CC/BM scheduling mechanism is tested in a full factorial experiment performed on a set of benchmark problems. It appears that the 50% rule for buffer sizing may lead to a serious overestimation of the required buffer protection. Regularly updating the baseline schedule and the critical chain provides the best intermediate estimates of the final project duration and yields the smallest final project duration. Using clever project scheduling and rescheduling mechanisms such as branch‐and‐bound, has a beneficiary effect on the final makespan.

Toward a measure of competitive priorities for purchasing

Journal of Operations Management 2001
The purpose of this paper is to develop a set of measures of purchasing’s competitive priorities. We maintain that purchasing is a strategic contributor to the firm, and that the selection and retention of external suppliers is a fundamental and strategic purchasing task that manifests the function’s competitive priorities. Researchers and managers increasingly view the operations and purchasing functions as intimately linked, and as playing important roles in supply chain management. Ultimately, the performance of the operations management system, measured in terms of quality, cost, delivery and flexibility, depends on inputs secured by the purchasing function from the firm’s suppliers. However, in a search for substantive relationships, the purchasing literature has largely overlooked methodological issues such as measurement. Using empirical data collected from North American purchasing executives, a confirmatory factor analysis provides evidence that purchasing’s competitive priorities may be conceptualized similarly to the competitive priorities in operations, with key differences. The measures satisfy key measurement criteria including unidimensionality, convergent validity, discriminant validity, and reliability. Five competitive priorities form the basis of a multidimensional measure of purchasing’s competitive priorities, the individual factors of which will allow for the examination of linkages between purchasing, operations and other parts of the supply chain.

An exploratory study of the effects of supplier relationships on new product development outcomes

Journal of Operations Management 2001
The literature about the influence of suppliers on new product development (NPD) project outcomes shows mixed results. Focusing on supplier relationships, especially the concept of supplier involvement, we present a two‐stage model explaining supplier relationships and their impacts on product quality, project development time and project cost. The level of supplier involvement on the NPD project is seen as contingent on the level of technical difficulty of the project. This model is tested using secondary survey data.

The impact of purchasing integration and practices on manufacturing performance

Journal of Operations Management 2001
Purchasing integration remains an under‐researched concept, despite being described as a key competence in the literature. This study explicates the concept of purchasing integration and examines its relationships with purchasing practices and manufacturing performance. Purchasing integration refers to the integration of strategic purchasing practices and goals with a firm’s objectives. Alternative models linking purchasing integration to purchasing practices and manufacturing performance are hypothesized and tested using empirical data. Purchasing integration was found to moderate the relationship between purchasing practices and manufacturing performance. Increased investments in purchasing integration were observed to lead to higher performance returns from investments in purchasing practices.

The rediscovery of postponement a literature review and directions for research

Journal of Operations Management 2001
The concept of postponement is increasingly drawing the attention of researchers and practitioners. Postponement means delaying activities in the supply chain until customer orders are received with the intention of customizing products, as opposed to performing those activities in anticipation of future orders. This paper reviews the literature on postponement dating back to 1965, and puts it in a systematic framework. In light of the classification of the literature developed, opportunities are identified for integration and cross‐fertilization between research papers in disciplines such as logistics and operations management and between the variety of research methods used. Some directions for research (in terms of content and methodology) are then formulated. For instance, the development of a more integrated supply chain perspective on postponement, and the application of triangulation rather than single methods. Specific research activities to meet these challenges are suggested in the paper.

Firm characteristics, total quality management, and financial performance

Journal of Operations Management 2001
This paper uses a sample of quality award winners to empirically test hypotheses that relate changes in operating income associated with effective implementation of total quality management (TQM) to various firm characteristics. The characteristics examined are firm size, the degree of capital intensity, the degree of diversification, the timing of TQM implementation, and the maturity of the program. We find that smaller firms do significantly better than larger firms. Firms that have won awards from independent award (a proxy for more mature TQM implementation) do significantly better than just supplier award winners. The evidence weakly supports the hypotheses that less capital‐intensive firms do better than more capital‐intensive firms, and more focused firms do better than more diversified firms. Finally, we do not observe any significant differences between the performance of earlier and later implementers of effective TQM. The key implications of these results are that many organizational characteristics moderate the benefits of TQM implementation. Although not all of these characteristics are controllable by managers, managers must set realistic expectations for the degree of benefits from TQM. The results for size and capital‐intensity validate the importance of TQM practices for smaller firms and environments that are more labor intensive. Investing to achieve a broader, deeper, and more mature TQM implementation (possibly by targeting an independent TQM award) should also result in higher benefits from TQM implementation. Furthermore, the results indicate that it is never too late to invest in TQM.

Relationships between implementation of TQM, JIT, and TPM and manufacturing performance

Journal of Operations Management 2001 open access
Research on Total Quality Management (TQM), Just‐in‐Time (JIT) and Total Productive Maintenance (TPM) generally investigates the implementation and impact of these manufacturing programs in isolation. However, many researchers believe and argue conceptually the value of understanding the joint implementation and effect of manufacturing programs. This study investigates the practices of the three programs simultaneously. We find that there is evidence supporting the compatibility of the practices in these programs and that manufacturing performance is associated with the level of implementation of both socially‐ and technically‐oriented practices of the three programs.

Arcs of integration: an international study of supply chain strategies

Journal of Operations Management 2001 19(2), 185-200
Though there is a wide acceptance of the strategic importance of integrating operations with suppliers and customers in supply chains, many questions remain unanswered about how best to characterize supply chain strategies. Is it more important to link with suppliers, customers, or both? Similarly, we know little about the connections between supplier and customer integration and improved operations performance. This paper investigated supplier and customer integration strategies in a global sample of 322 manufacturers. Scales were developed for measuring supply chain integration and five different strategies were identified in the sample. Each of these strategies is characterized by a different “arc of integration”, representing the direction (towards suppliers and/or customers) and degree of integration activity. There was consistent evidence that the widest degree of arc of integration with both suppliers and customers had the strongest association with performance improvement. The implications for our findings on future research and practice in the new millennium are considered.

Supply networks and complex adaptive systems: control versus emergence

Journal of Operations Management 2001 19(3), 351-366
In much of the current literature on supply chain management, supply networks are recognized as a system. In this paper, we take this observation to the next level by arguing the need to recognize supply networks as a complex adaptive system (CAS). We propose that many supply networks emerge rather than result from purposeful design by a singular entity. Most supply chain management literature emphasizes negative feedback for purposes of control; however, the emergent patterns in a supply network can much better be managed through positive feedback, which allows for autonomous action. Imposing too much control detracts from innovation and flexibility; conversely, allowing too much emergence can undermine managerial predictability and work routines. Therefore, when managing supply networks, managers must appropriately balance how much to control and how much to let emerge.