The warehouse problem requires the determination of a sequence of buy and sell decisions at discrete points in time. By equating points in time and points in space, the warehouse problem can be identified with a special case of the shortest-route problem. In the present note a special matrix formulation is employed to yield simple solutions to both problems. An example is included to illustrate the method.
A particular type of inventory model, a hydroelectric model, with a linear cost structure is studied. The form of the optimal water utilization policy for a hydroelectric installation (at which the assumptions of the model are satisfied) is described. The nature of the optimal policy if the cost function is convex is indicated. The optimal policy if future river flow is known is also indicated.
An analysis and review of the basic problems associated with the efficient operation of production and assembly lines, and the evaluation of the effectiveness of internal storage. Three basic approaches are discussed: loss transfer (fractions of losses due to stoppage are transferred to succeeding stages) stochastic (distribution of durations of working and down states of each stage leading to determination of state probabilities) queue (treating production lines or queue systems with limitations on size of queue between stages) The concept of the cyclic queue is reviewed and discussed in production line terms (i.e., following a frame or jig through its cycles). The approaches are compared and industrial illustrations are given. The methods discussed apply to problems which, in physical appearance, are different from production lines; among these are chemical production, overhaul and repair systems, etc. A review of the field indicates that considerably more research and analysis is required.
This note presents an alternate proof of a result of L. G. Mitten, solving the problem of sequencing n jobs through two machines with arbitrary time lags when the job sequences are the same for both machines. The more difficult general problem is also discussed and partially solved.
Several well known purchasing policies or “buying strategies” are studied by-means of simple mathematical models. The basic properties of these policies are demonstrated under the assumption that future market prices are viewed as random variables. An optimal policy for forward buying is obtained, and strategies for dollar averaging and speculation are investigated.
The value relationships among the competitors in a competitive situation are described by means of competitive coefficients. The competitive coefficient defines the indirect gain or loss to a competitor as a result of losses or gains by the other competitors. An example is given to illustrate the use of the coefficients in a game situation.
This paper presents a mathematical model for determining a minimum cost strategy for the following personnel recruiting and selection situation. A quota is set for the minimum number of good employees to be added each period, and selection is done on the basis of a test having a known correlation with the given criterion of job success. There is a total cost for all individuals recruited and a loss attached to each person hired who turns out to be unsatisfactory. The problem is to determine a minimum acceptable score on the selection test and the number of persons to be recruited which will yield a minimum cost, including loss, as well as satisfy the prescribed quota at a given probability level.
The problem of this paper is that of scheduling several one-stage tasks on several processors, which are capable of handling the tasks with varying degrees of efficiency, to minimize the total loss, which is a sum of losses associated with the individual tasks. Each task has a deadline; the individual loss associated with it is a function of amount of time between the deadline and the time of completion if the former precedes the latter, and zero otherwise.
This paper attempts to define long-range planning as the organized process of making entrepreneurial decisions. It tries to answer three questions asked by managers and management scientists when they hear the phrase “long-range planning”: What long-range planning is and what it is not; why it is needed; and what is needed to do long-range planning. The paper concludes with a brief statement why long-range planning can be considered a major opportunity for, and challenge to, Management Science.