Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
62 results ✕ Clear filters

Note—Optimal Component Acquisition for a Single-Product, Single-Demand Assemble-to-Order Problem with Expediting

Manufacturing and Service Operations Management 2008
We consider a component acquisition problem for a contract manufacturer who faces a one-time stochastic demand for a single product consisting of a number of components. Components can be ordered early at normal prices before the demand is revealed, or they can be replenished later at higher prices due to expediting. In addition, the customer pays a price for the final product that is nonincreasing in the delivery lead time to discourage late delivery. We propose a cost-minimization model and develop an efficient polynomial time algorithm to solve the problem.

Optimal Backlogging Over an Infinite Horizon Under Time-Varying Convex Production and Inventory Costs

Manufacturing and Service Operations Management 2008
We consider an infinite horizon production planning problem with nonstationary, convex production and inventory costs. Backlogging is allowed, unlike as in related previous work, and inventory cost is interpreted as backlogging cost when inventory is negative. We create finite horizon truncations of the infinite horizon problem and employ classic results on convex production planning to derive a closed-form formula for the minimum forecast horizon. We show that optimal production levels are monotonically increasing in the length of horizon, leading to solution convergence and a rolling horizon procedure for delivering an infinite horizon optimal production plan. The minimum forecast horizon formula is employed to illustrate how cost parameters affect how far one must look into the future to make an infinite horizon optimal decision today.

Partitioning of Servers in Queueing Systems During Rush Hour

Manufacturing and Service Operations Management 2008
This paper is motivated by two phenomena observed in many queueing systems in practice. The first is the partitioning of server capacity among different customers based on their service time requirements. The second is rush hour demand where a large number of customers arrive over a short period of time followed by few or no arrivals for an extended period thereafter. We study a system with multiple parallel servers and multiple customer classes. The servers can be partitioned into server groups, each dedicated to a single customer class. The system operates under a rush hour regime with a large number of customers arriving at the beginning of the rush hour period. We show that this allows us to reduce the problem to one that is deterministic and for which closed-form solutions can be obtained. We compare the performance of the system with and without server partitioning during rush hour and address three basic questions. (1) Is partitioning beneficial to the system? (2) Is it equally beneficial to all customer classes? (3) If it is implemented, what is an optimal partition? We evaluate the applicability of our results to systems where customers arrive over time using (1) deterministic fluid models and (2) simulation models for systems with stochastic interarrival times.

ERP Competence-Building Mechanisms: An Exploratory Investigation of Configurations of ERP Adopters in the European and U.S. Manufacturing Sectors

Manufacturing and Service Operations Management 2008
This paper contributes to the literature on enterprise resource planning (ERP) by pursuing two objectives. First, it identifies configurations of ERP adopters that have similar needs and develop similar competencies. Second, it tests the hypothesis that, to maximize benefits from their ERP projects, organizations should align their ERP competence-building mechanisms with the ERP needs that arise from their operational environment. The analysis of a sample of manufacturing companies that implemented ERP between 1995 and 2001 uncovers four distinct configurations representing different degrees of fit between needs and competence-building mechanisms: the frugal ERP, the extensive business process reengineering (BPR), the adaptive ERP, and the straitjacket. The results support our hypothesis and suggest that the consequences of a misfit between needs and competence-building mechanisms are more severe for companies that operate in complex and dynamic environments and have informal organizational structures than for firms with rigid structures that operate in simple and stable environments.

Managing an Assemble-to-Order System with Returns

Manufacturing and Service Operations Management 2008
We consider a multiproduct assemble-to-order (ATO) system, in which inventory is kept only at the component level and the finished products are assembled in response to customer demands. In addition to stochastic demand for finished products, the system experiences stochastic returns of subsets of components, which can then be used to satisfy subsequent demands. The system is managed over an infinite horizon using a component-level base-stock policy. We identify several ways in which returns complicate the behavior of the system, and we demonstrate how to handle these additional complexities when calculating or approximating key order-based performance metrics, including the immediate fill rate, the fill rate within a time window, and average backorders. We also present a method for computing a near-optimal base-stock policy. We use these results to address managerial questions on both operational and product-design levels. For example, we find that tracking product-based (as opposed to component-based) return information appears to provide much less value than tracking product-based demand information, and we explore the impact of the number of products, component lead times, and different patterns of component returns (joint versus independent returns, returns of common versus dedicated components) on the value of component commonality.

Optimal Scheduling and Incentive Compatible Pricing for a Service System with Quality of Service Guarantees

Manufacturing and Service Operations Management 2008
This paper proposes a resource allocation and pricing mechanism for a service system that serves multiple classes of jobs within an organization. Each class of service request is subject to a class-dependent quality of service (QoS) guarantee on the expected delay bound, which may be imposed by business rules in an organization or other application-specific technical constraints. We develop an extension of a resource allocation and pricing mechanism for an M/M/1 system. In contrast to the system without the QoS guarantee, where a fixed priority scheduling policy—known as the cμ rule—is optimal, we show that the system may need to adopt a more general randomized priority scheduling policy to maximize the overall system profit. We also develop a transfer pricing scheme that is both optimal and incentive compatible, allowing users to act in their self-interests while collectively achieving the system optimum. We show that the pricing scheme with the QoS guarantee depends on the scheduling policy implemented and has different characteristics from that without the QoS guarantee.

Effects of Information Disclosure Under First- and Second-Price Auctions in a Supply Chain Setting

Manufacturing and Service Operations Management 2008
We study a supply chain where an upstream supplier auctions his inventory or capacity as a bundle. The importance of this setting is twofold: From a practical point of view, there are several examples, both in manufacturing (e.g., auctioning the capacity of a wafer fabrication facility) and service industries (e.g., auctioning the sponsorship of a website), where a supplier's capacity is sold as a single piece; from a theoretical side, it highlights the information asymmetry introduced on the downstream supply chain parties when the auction result is disclosed. We formulate the problem as a two-stage supply chain comprising a single supplier and two resellers. Each reseller receives a signal of the consumer demand and bids for the capacity of the supplier. The supplier announces the winner as well as the auction price. Both resellers can get additional units in a procurement market and then engage in Cournot competition in the consumer market. We analyze the impact of the information elicited by the supplier in the early stage of the game. We characterize sufficient conditions for the existence of equilibrium behavior, derive the equilibrium bidding functions under both first- and second-price auctions, and show that the bidding functions are lower than the corresponding ones for a single-shot auction without resale. Our computational experiments indicate that both the supplier and resellers are better off running a second-price auction and that consumers benefit if the resellers have very different signals on the total demand. Overall, our results suggest that traditional auctions may have a profound impact in the context of a supply chain because of the information disclosure in the upstream stages.

Multiple Part-Type Production in Robotic Cells: Equivalence of Two Real-World Models

Manufacturing and Service Operations Management 2008
We address the scheduling of operations in a robotic cell that produces multiple part-types. The objective is to obtain a cyclic schedule—a sequence of robot moves and an ordering of the parts—that minimizes the long-run average time to produce a part or, equivalently, maximizes the throughput. We consider two different models that are currently used in practice. The first is a single-gripper cell with a unit-capacity output buffer at each machine. The second is a bufferless dual-gripper cell. We focus our analysis on a widely used class of cyclic solutions, referred to as CRM cycles. The main outcome of our analysis is the equivalence of the two models (i.e., the maximum throughput is the same for both models) under conditions that are common in practice. The equivalence is established in two steps: (i) identification of a subset of dominating cyclic solutions for each model, and (ii) provision of a one-to-one mapping between these dominating cycles such that corresponding cycles have the same throughput. We also analyze the computational complexity of the throughput maximization problem for the two models. The enhanced capabilities (i.e., output buffers and dual gripper) of both models were motivated by a need to improve the throughput. However, the costs of acquiring these capabilities differ significantly. Our discussions with operations managers at a Dallas-area robotic cell manufacturer revealed that the total cost of designing and programming the robot's control mechanism for a cell with output buffers is about 20% less than that for a dual-gripper cell. The equivalence of the two models is, therefore, somewhat surprising and has significant practical implications. For cells that operationalize CRM cycles, the use of output buffers instead of a dual gripper can result in considerable savings without compromising throughput.

Division of Labor in Medical Office Practices

Manufacturing and Service Operations Management 2008
This paper examines the staffing, division of labor, and resulting profitability of primary care physician practices. Division of labor is viewed as a mechanism to increase the efficiency of production processes through specialization. At the same time, division of labor also introduces coordination cost as handoffs and communication needs increase. We attempt to empirically assess the net effect in primary care physician offices. We collected data from a sample of these practices and tested two hypotheses: (H1) controlling for staff size, greater delegation through the use of more staff types will decrease the throughput of visits, and (H2) controlling for staff size, income per unit time generated by the practice is decreasing in the number of staff types. We find evidence supporting both hypotheses. We conclude that many physicians are gaining little financial benefit from delegating work to support staff. This suggests that small practices with few staff may be viable alternatives to traditional practice designs.

The Value of Component Commonality in a Dynamic Inventory System with Lead Times

Manufacturing and Service Operations Management 2008
Component commonality has been widely recognized as a key factor in achieving product variety at low cost. Yet the theory on the value of component commonality is rather limited in the inventory literature. The existing results were built primarily on single-period models or periodic-review models with zero lead times. In this paper, we consider a continuous-review system with positive lead times. We find that although component commonality is in general beneficial, its value depends strongly on component costs, lead times, and dynamic allocation rules. Under certain conditions, several previous findings based on static models do not hold. In particular, component commonality does not always generate inventory benefits under certain commonly used allocation rules. We provide insight on when component commonality generates inventory benefits and when it may not. We further establish some asymptotic properties that connect component lead times and costs to the impact of component commonality. Through numerical studies, we demonstrate the value of commonality and its sensitivity to various system parameters in between the asymptotic limits. In addition, we show how to evaluate the system under a new allocation rule, a modified version of the standard first-in-first-out rule.